For a title that was only showed off first time E3 2016 with a non finalized game engine, did people think it was this year?
Looking at the length of development of AAA productions hitting 4-5 years or more, people think he would hit it in only 3 or less or something?
Sigh.Deal with? A game "delay" to a game with no release date? Is that a Kojima exclusive?
Going by those tweets i bet he probably got sick of people complaining about how much he's "not working".
So the game is that far away? Bummer.
Yeah i was sure it was a end of the year title but that's okay, i prefer a polished game anyway
Kojima said in the past he is planning to release it in 2019, even in TGS 2018 he hinted at a 2019 launch, I guess that he needs to push it to 2020has there ever even been a year announced for a release date officially for this? I didn't even understand those thinking it was a 2019 game - didn't seem to be in development that long (even for a regular game, let alone a Kojima game for a brand new studio needing setting up too)
It's not gonna be normal open world like ubisoft game or Horizon. The setting is way too weird for that.Ugh...it's an open world game. Somehow I never caught that detail. My interest has dropped from morbidly curious to nothing.
It's not gonna be normal open world like ubisoft game or Horizon. The setting is way too weird for that.Ugh...it's an open world game. Somehow I never caught that detail. My interest has dropped from morbidly curious to nothing.
Ugh...it's an open world game. Somehow I never caught that detail. My interest has dropped from morbidly curious to nothing.
Yeah the game will sell systems just on the hype factor of Kojima alone, plus all of the super bizarre clips we've seen so far. I half expect the finished game will be a lot of weird cutscenes and I won't know what the hell is going on and I'll never finish it... But I'm still hyped to buy it, if it's a cross gen release with PS5 oh boy..Take all the time you need......this game is gonna be nuts....and I've never had any interest in MGS.
From it's reveal through all the trailers this game has drawn me in.....can't wait!